Author name: Atul Mathur

What can be leveraged from commissioning to OQ?

What can be Leveraged from Commissioning to Operational Qualification (OQ)? Leveraging is a buzzword you’ll find floating around as soon as the qualification team comes on board a project. Q team’s first task is to formulate a “qualification strategy” for the project, including a critical piece called “leveraging.” Essentially, leveraging is asking three questions: What’s

What can be leveraged from commissioning to OQ? Read More »

Is <65% RH a safe bet with untreated fresh air in Singapore?

Is < 65% Relative Humidity a Safe Bet with Untreated Fresh Air in Singapore? If there is one issue that often bogs down HVAC designers and building owners in Singapore, it’s relative humidity (RH) in the air-conditioned spaces. Hot and humid, Singapore’s climate demands extra care while designing HVAC systems, or else you end up

Is <65% RH a safe bet with untreated fresh air in Singapore? Read More »

Three classic pitfalls that delay commissioning

How to Avoid Three Classic Pitfalls that Delay Commissioning Right at the Start? Commissioning is like a patty in a sandwich. It gets squeezed between the fixed project completion deadline and the delays in design and construction upstream. By the time a project progresses to commissioning, it becomes super urgent. The commissioning team always faces

Three classic pitfalls that delay commissioning Read More »

error:
Scroll to Top